New kitchen
One fixed price per metre, everything in: cabinets, worktop, sink and appliances. A checked fitter builds it with a second person in a day.
249 € per metre, at least 690 €
All base and tall units, every wall added up. It is in your IKEA plan.
Wall units on a wall without base units?
Corners in the worktop
An island or a peninsula?
An extractor hood?
How many cabinets?
optionalMore than 20 cabinets or more than 5 metres take a second day.
Your fixed price
249 € per metre, at least 690 €. Give the length to see your price.
Where is the kitchen built?
Floor
On which day?
At the earliest in 15 days, so your time to withdraw ends first. The fitter comes at 8 am.
How does the kitchen reach you?
Only want the boxes brought? Book that as a transport. Book a transport
What do the wall units hang on?
Wall units hang only on walls that hold them safely.
Which appliances come with it?
Fitting them is in the price.
For your fitter, in case something comes up on the day.
Every cabinet, front, drawer, plinth and cover panel
The worktop cut to size, with cut-outs for sink and hob
Sink, tap and siphon to the existing valves
Built-in appliances with a plug, and the dishwasher
Wall units, handles, interiors and plug-in lighting
A cooker or oven without a plug (electrician)
Gas (gas installer)
Stone or quartz worktops
New water or drain pipes
Taking the packaging away: it stays with you, folded
1You book now. Nothing is charged yet.
2A checked fitter commits. Only then do we charge .
3If nobody has committed ten days before the date, the booking ends free of charge.
4Two days before the date you check the delivery. At the end you sign off the build together, with photos.
Conditions of the build
The build is owed by your fitter: a self-employed professional with their own registered business who takes your job. BringEasy arranges the job and handles the payment. It rests on your details and your kitchen plan; mistakes in the plan or the measurements are not the fitter's. Two days before the date you check the delivery against the order confirmation. If parts are missing on the day, what can be built is built; the rest follows on a second date at the fixed price shown. Wall units hang only on walls that hold them safely; what cannot hang, we refund at the rate shown. Water is connected only to the existing valves in the sink cabinet, power only by plug; hard-wired cookers and gas belong to a specialist firm. The packaging stays with you, folded. At the end you sign off the build together, with photos; faults in the build are put right by your fitter. You can withdraw from the build within 14 days of booking; the date is never before that.
Please confirm
How we handle your data is in the privacy policy.
By booking you agree to the terms and the cancellation terms and confirm that you are 18 or older. You can cancel free of charge until 24 hours before your time window. After that we charge a flat €40; you may prove that we suffered no loss or a much smaller one.